Fast and Efficient Installation

The HoldFast System, effectively comprising a series of rubber ‘domino’ panels, simply drops in to place.

A 40 metre crossing can be installed in three hours without the need for overhead electrical isolation. This is proving a major commercial attraction in selecting HoldFast, while yielding further environmental advantage.

Crossings can be delivered and off loaded direct from manufacturing plant to the installation site on the day (or night) of installation. This reduces fuel and road freight requirements.

HoldFast prides itself on installation and the enormous cost savings. The HoldFast Unitised system comprises only two items to install: the panels and a few base plates. Its simplicity ensures a fast installation.

The system does not require bolts or screws - simply base plates with grip tight nuts. These are not 'fixed' to the sleeper but just sit on the sleeper. Applying a 'soap' lubricant prior to lowering the panels will encompass the grip tight nuts within the matching panel holes.

HoldFast Lifting Pin

Designed to facilitate the already efficient method of laying HoldFast panels, the HoldFast Lifting Pin aims to speed up installation times, reduce network downtimes and reduce labour costs.

Also requiring a suitable lifting mechanism (eg. a Bobcat or a forklift) which can be attached to the Lifting Pin shackle, the pins are inserted into the panels and as the weight is applied the resultant force will pull the straps connecting the pins to an acute angle, pulling the pins in towards each other. This resultant force is then adequate to keep the pins in place when lifting the panel.

The holes in the panels are not central but set back slightly from the ‘non-rail’ edge. This encourages the ‘rail edge’ of the panel to angle down, facilitating installation of the units, as they naturally position themselves for quick installation.

Free Consultation
Ask HoldFast for a free site survey. Whether it is a new location or crossings in need of replacement, HoldFast will provide a free survey and assessment of your requirements.

Free Design
Using the latest CAD technology, HoldFast’s design studio will develop a bespoke system to match your requirements.

Free Delivery
HoldFast can quote to include delivery and off loading direct to the site of installation on the date and at the time your contractors specify.

Complete crossings can be installed in hours, reducing road and rail closures. Panels have been known to be installed at one per minute!

The installation is remarkably easy with the use of liquid soap

Unique boltless system enables panels to be removed and installed very rapidly.


The serated pins are easily inserted into the HoldFast panels.


Once the straps are pulled taught, the pins are pulled towards eachother. The resultant force is sufficient to keep the pins in place when lifting the panel.

 

HoldFast Managing Director Peter Coates-Smith: "If there was a world record time for laying level-crossings, I'm sure we'd beat it!"


The panels slot snugly next to eachother, there is no need for bolts or screws.


The HoldFast Lifting Pin reduces the number of people needed to fit the level crossing.