| HoldFast
Go From Strength to Strength |
October
04' - as supplied and printed in RailStaff magazine
HoldFast will be again exhibiting the award winning HoldFast
crossing platform, designed and proven the world over to dramatically
improve road and rail safety; reduce road and rail maintenance;
extend crossing life span; and reduce road and rail costs and
disruption.
The simple solutions are often the best and, time and time again,
contractors find the ease and simplicity of the HoldFast system
incomparable to other more complicated systems.
APPLICATIONS
HoldFast’s staff will be please to discuss your future requirements
for all crossing situations.
• Highway crossings
Full depth rubber, high antiskid characteristics and its integrated
road / rail design are just a few of the reasons why this has
become the popular choice for locations ranging from inner cities
to ports.
• Pedestrian and cycle crossings
Simple to install, hard wearing and designed to prevent any panel
gapping, The Holdfast pedestrian crossing is specified by councils,
The London Underground and national rail networks.
• Track access points (T.A.P’s)
To date, over eighty five single track, 25 metre long crossings
have been used at Road Rail Access Points (RRAPs) in single, double
and treble arrangements on Network Rail’s multi billion
pound West Coast Route Modernisation Programme. This system has
proved so popular it is now a stock item. The panels can be installed
and removed quickly and transferred to other track areas if necessary.
• Farm crossings
Special panels are manufactured with a honeycomb structure to
reduce the cost and maintain sufficient durability and strength
for platforms enduring farm traffic.
• Metro crossings
High safety values for road, rail, cycle and pedestrian users
make this system ideal for urban metro locations.
• Emergency Platforms
Emergency platforms have included The Sudbrook Emergency Train
Stabling project outside the Severn Tunnel, a 14.4 metre HoldFast
crossing delivered to site and installed within half a day during
a T24 protection closure.
• Station, Depot and maintenance platforms
HoldFast has been the favoured supplier for many of the UK’s
major infrastrucure projects. Virgin’s £30 million
Central Rivers Cross Country depot near Burton on Trent in Staffordshire
featured 24 road crossings, 12 barrow crossings, 28 pedestrian
crossings and 4 turnouts!
HoldFast is a popular platform for situations where the platform
needs to be fitted around pillars, steps and other obstructions,
as panels can be easily cut to measure on site (see Stonebridge
photograph).
MARKET LEADERS
Five key criteria have secured HoldFast’s market dominance:
• Fast installation
• Strength and long life durability
• Maximum safety for rail and road users
• Cost savings (to rail operators, inslallation teams, infrastructure
owners and
highway authorities)
• Environmental impact (minimal road and rail closures to
reduce congestion and pollution, and recycled rubber products)
HoldFast’s Managing Director, Peter Coates Smith, explains:
“We pride ourselves on being much more than a supplier.
Rather than promoting and selling in a fixed solution, HoldFast
has a history of working closely with Network Rail, urban transit
operators and allied contractors to continually improve and respond
to the demands of highway and rail authorities; road and rail
users; contractors and changing public transport trends.”
A Flying Start to 2004
2004 could not have got off to a better start! In February HoldFast
was awarded the much respected HSBC Rail Supplier of the Year
Award. At the same event, Holdfast was also highly commended in
the category Rail Infrastructure Excellence of the Year.
ENQUIRIES
• Free Consultation
Contact HoldFast for a free site survey. Whether it is a new
location or crossings in need of replacement, HoldFast will
provide a free survey and assessment of your requirements.
• Free Design
Using the latest CAD technology, HoldFast’s design studio
will develop a bespoke system to match your requirements.
• Free Delivery
HoldFast can quote to include delivery and off loading direct
to the site of installation on the date and at the time your
contractors specify.
|
|
|
Pioneers of the Nation
(above)
Last
year, HoldFast’s Managing Director, Peter Coates Smith,
joined the likes of Sir Cliff Richard and Richard Branson at
Buckingham Palace as one of ‘The 500 Pioneers of the Nation’,
recognising his work in developing safer level crossings.

Recent
Projects: Horton
Road
(above)
The routine removal and replacement of a HoldFast crossing at
Gloucester demonstrates how remarkably fast these crossing are
to install or remove for tamping. The two track crossing comprises
56 panels. It took just two and a quarter hours to remove and
stack them and no longer to replace.
The contractors, Fifth Rail, supplied a JCB digger and telescopic
handler but these were only required to take the panels off site!
They lifted out the panels using a p-ray bar on each of the panels
and with just one man on each they levered the panels out without
any mechanical assistance.
They were then numbered and stacked. When replaced, the JCB was
on stand by in case they needed to be put more firmly but with
a little lubrication the panels were easily reinserted.
Recent
Project: Stonebridge
(above & below)
Earlier this year, HoldFast supplied a six road depot platform
for Stonebridge Park BCV Depot to enable drivers to embark and
disembark safely from the underground trains, and for complete
train side maintenance and crew access.
The system was supplied direct to the customer, Metronet. Because
of HoldFast’s famous simplicity of installation, their own
staff were able to install the panels with minimal supervision
from Fifth Rail.
The platform needed to be fitted around pillars, steps and other
obstructions and HoldFast was chosen, in part, because of the system’s versatility.
|
|
|
|